Redevelopment
The only constant in life is change embrace it to stay on the right path.
Upgrading your lifestyle is like moving one step closer to your goal. With Real estate prices touching an all-time high, residents in old buildings are sitting on a virtual gold mine.
Hence, redevelopment has turned into the most lucrative and practical long-term solution for the old landmarks and addresses in Pune.
Be assured of fulfilling your aspirations and expectations through our transparent dealings and redevelopment expertise. Hassle-free execution, revised carpet area, change in flat’s value, and rent reimbursement are just some of the benefits for house owners.
In spite of space constraints, complicated plans, and limited design possibilities, we have delivered new-age spaces with urban amenities and quality construction specifications at prime locations within the promised period.
For Redevelopment – +91 70909 00059

Redevelopment Steps
Redevelopment Process
Understanding the needs of the residents
The first step involves interacting with the existing residents of the building/society and getting clarity about their expectations.
Conducting an in-depth location analysis
After understanding the expectations, a team visits the site and performs a detailed study of the site and its immediate neighbourhood.
Preparing the redevelopment blueprint
This stage involves creating a template of the redevelopment work that will be implemented with proposed designs of indoor & outdoor spaces.
Fine-tuning the proposal as per PMC framework
After bringing the proposal for redevelopment in sync with PMC's guidelines, a legal agreement is signed with the housing society to proceed
Registration of legal agreement with the housing society
After bringing the proposal for redevelopment in sync with PMC's guidelines, a legal agreement is signed with the housing society to proceed.
Obtaining approvals from PMC
Post the legal agreement, the procedure is started for all the construction related approvals from the relevant departments of PMC.
Shifting of residents prior to site takeover
Before commencing the redevelopment activity at the site, the existing residents are moved into suitable accommodation for a comfortable stay.
Commencing redevelopment as per sanctioned plan
With the residents having relocated and all approvals in place, demolition and construction work is taken up, as per the sanctioned plan by PMC.
Availing occupancy and completion certificate
Once the redevelopment work is accomplished as per the sanctioned plan, authorities are approached for occupancy and completion.
Handover of homes with new member inductions
A grand handover ceremony is conducted at the new building with a warm welcome for all the existing & new members of the society.
Key Features
Our thoughtfully crafted specifications ensure a blend of quality, comfort, and functionality. From premium materials to advanced features, every detail is designed to enhance your living experience. Discover homes built to meet the highest standards of excellence
Structure
- RCC-framed structure designed as per earthquake resistance norms, using the highest quality material.
Elevation
- Elegant and impressive elevation for aesthetic beauty.
Parking
- Interlocking paving blocks in the parking area with adequate lighting.
Lobby
- A grand and attractive entrance lobby with a smart card access control system for enhanced security.
Parking
- Interlocking paving blocks in the parking area with adequate lighting.
Digital Security
- Video door phone for each flat and common area CCTV cameras.
Firefighting
- Latest firefighting equipment installed as per PMC guidelines.
Additional Security
- Grills installed on all windows.
Sustainability
- Solar water panels provided as per PMC guidelines.
Conservation
- Rainwater harvesting system for water conservation as per PMC guidelines.
Compound Wall
- Aesthetically designed and well-lit compound wall, including a façade for the front compound wall.
Checklist
For Ensuring Speedy Redevelopment
- Copy of old PMC approved plans
- Copy of Conveyance deed
- General body resolution for redevelopment
- List of members with their respective carpet areas
- Property card for the plot with 7/12 extract
- Details of the total plot area & constructed area
Redevelopment Impact
Dinmanee
(3 BHK)


prakash
(4 BHK)


Ashokban
(3 BHK)


Arati
(3 BHK)


shubhamkaroti
(2 & 3 BHK)


Standard Documents
- Society Registration Certificate
- Approved Building Plan
- Conveyance Deed/Lease Deed/Sale Deed
- Copy of Resolution by society members towards redevelopment
- Documents/Deeds/Agreements etc. (As per the society’s plot)
- List of members with their respective carpet areas
- Property Card
- Search Report and Title Certificate
